These heights are compatible with most common vanity sinks.
Bathroom water line in floor.
Measured from centerline running vertically through the center of the toilet supply line hole should be 6 inches to the side of centerline.
From the center of the drain measure 4 inches to the left and 4 inches to the right.
I suppose you could bring the water supply up directly behind the toilet and put an outlet horizontally on the floor which will make washing the floor a pleasure not but the preferred location of the water supply according to the instructions is coming out of the wall 3 6 off the floor and 5 5 8 left of the flange centerline.
You can either run these lines through the wall or up from the floor depending on the location of your bathroom.
A hot and cold line for both the bathtub shower and the sink and a cold water line for the toilet.
Homewerks worldwide 3 8 in compression 16 in braided stainless steel faucet supply line.
Sink drain lines are typically between 18 and 20 inches above the finished floor.
Toilet rough in details.
The bathroom sink s water lines are roughed in 3 inches above the drain.
When the lines are installed in the floor or wall a necessary valve or faucet is always installed to cap off the pipes so that water can be turned off to the vanity while the remainder of the.
Install the water lines.
Item 751642 model 7223 16 38 4.
Easy to install it features a chrome plated finish to resist corrosion and fits 1 2 in.
Keep piping secure through floor or ceiling openings keep piping secure through floor or ceiling openings with the copper tube split escutcheon.
Running drainpipe through joists calls for meticulous work.
Check toilet to confirm location water supply connection.
The eastman plumbing access panel is designed to the eastman plumbing access panel is designed to provide access to plumbing lines and other fixtures installed behind walls and ceilings.
If joists are 16 inches on center and pipes run across them at a right angle holes should differ in height by about 3 8 inch.
This access panel is built with durable 16 gauge galvanized steel and a flush frame door with rounded safety corners.
The hot line and cold line are spaced 8 inches apart from left to right.
Measure 21 inches approximately above the finished floor.
Ideally 8 1 4 inches above the floor.
No need to use screws to hold it in place.
The escutcheon rotates 360 while remaining securely where.
Water supply lines are usually just a couple of inches higher between 20 and 22 inches from the floor and installed one to each side of the drain line.